  • Work proceeds preparing the Data Center for instantiation of BRC's institutional/condo cluster: power, cooling, racks, and nodes are ordered and beginning to arrive / be installed
  • BRC service lead Gary Jung and RIT leadership met with Eric Fraser (EECS) and¬†Nuclear Engineering Profs. Miassimiliano Fratoni and Rachel Slaybaugh re: NE researchers' interest in contributing to and using the BRC Institutional/Condo cluster
  • RIT Reading Group on Virtualization (notes) on 4/10, with representation from D-Lab, ETS, Econometrics/Statistics, IST-EIS, and RIT
  • The first LBL-BRC / RIT-AD joint team meeting took place on Friday 4/11